5.30.2012

(lazy post - not even prepared to rotate photos)

first paving job; basket weave brick laying, two days. process; removed existing paving, barrowed out dirt, shovelled in crushed rock and sand, levelled, lay curve, lifted fuck loads of bricks into the landscape, lay bricks, swept sand evenly across paving, sprinkled mortar and lightly sprayed with water.
a month of sporadic embroidery
first lead light window. process; choose design and cut glass to size, stretch, cut and place lead cane, solder all points, putty in between lead cane and glass, pick off excess, scrub down, polish with whiting, repeat on other side.
 pre-soldering:
 collaboration with hiromi tango at goma in brisbane
 second window
 pre-soldering:

No comments:

Post a Comment